Blue Winds is now ready to be turned over. She is unbolted from
the strong and lifted.....
|

A rope is tied around her and she is eased over as the gravity
pulls the keel towards the ground....
|

She is over and ready to be set up and leveled...
|

The temporary framing is removed from the inside of the hull
and she is ready to be fiberglassed.
|

The foam is removed from the keel and floor section......
|

A series of 12 cabin sole supports are built that will be fiberglassed
into the bilge...
|

The sole supports are in place....
|

A plywood cabin sole is put in place...the white board in the
center is made up of laminated 2 x 4's set out across four of
the sole supports to spread the pressure of the mast which sits
on it....
|

This is the corner post for the cabin top....the plywood on
the bottom is the deck.
|

Ceiling beams were laminated spruce and mahogany.
|